experiment 1

Chandana
Chandana D M
Created on Jan 18, 2021 0 0 2
experiment 1
100%

Integrated Circuits Used

Procedure

  1. Connect Input-12 to Pin-1 (Input) of ICBase-1 (74LS08).
  2. Connect Input-11 to Pin-2 (Input) of ICBase-3 (74LS08).
  3. Connect Pin-1 (Input) of ICBase-3 (74LS08) to Pin-3 (Output) of ICBase-1 (74LS08).
  4. Connect Pin-4 (Input) of ICBase-1 (74LS08) to Input-10.
  5. Connect Pin-2 (Input) of ICBase-3 (74LS08) to Pin-6 (Output) of ICBase-1 (74LS08).
  6. Connect Output-6 to Pin-3 (Output) of ICBase-3 (74LS08).
  7. Connect GND Port to Pin-7 (Ground) of ICBase-1 (74LS08).
  8. Connect GND Port to Pin-7 (Ground) of ICBase-2 (74LS32).
  9. Connect GND Port to Pin-7 (Ground) of ICBase-3 (74LS08).
  10. Connect VCC Port to Pin-20 (VCC) of ICBase-1 (74LS08).
  11. Connect Pin-20 (VCC) of ICBase-2 (74LS32) to VCC Port.
  12. Connect VCC Port to Pin-20 (VCC) of ICBase-3 (74LS08).
  13. Connect Input-11 to Pin-2 (Input) of ICBase-1 (74LS08).
  14. Connect Input-9 to Pin-5 (Input) of ICBase-1 (74LS08).
  15. Add IC 74LS08 into ICBase-1 (74LS08).
  16. Add IC 74LS32 into ICBase-2 (74LS32).
  17. Add IC 74LS08 into ICBase-3 (74LS08).
  18. Connect VCC Port to ICBase-1 (74LS08).
  19. Connect VCC Port to ICBase-2 (74LS32).