test saved circuits

test
test test
• Created on Dec 27, 2021 • 0 • 0 • 1
test saved circuits
100%

Integrated Circuits Used

Description

test saved circuits

Procedure

  1. Add IC 74LS08 into ICBase-2 (74LS08).
  2. Connect Input-9 to Pin-1 (Input) of ICBase-2 (74LS08).