New Circuit

shivang
shivang
• Created on Nov 3, 2026 • 0 • 0 • 1
New Circuit
100%

Integrated Circuits Used

Procedure

  1. Add IC 74LS90 into ICBase-2 (74LS90).
  2. Connect Clock port of 5Hz frequency to Pin-20 (Input) of ICBase-2 (74LS90).
  3. Connect Seven segment display 1 to Pin-18 (Output) of ICBase-2 (74LS90).
  4. Connect VCC Port to Pin-5 (VCC) of ICBase-2 (74LS90).
  5. Connect GND Port to Pin-16 (Ground) of ICBase-2 (74LS90).
  6. Connect Pin-1 (Input) of ICBase-2 (74LS90) to Pin-18 (Output) of ICBase-2 (74LS90).
  7. Connect Seven segment display 1 to Pin-15 (Output) of ICBase-2 (74LS90).
  8. Connect Seven segment display 1 to Pin-14 (Output) of ICBase-2 (74LS90).
  9. Connect Seven segment display 1 to Pin-17 (Output) of ICBase-2 (74LS90).