New Circuit

Atharv Arvind Giri
Atharv Arvind Giri
• Created on Nov 4, 2026 • 0 • 0 • 1
New Circuit
100%

Integrated Circuits Used

Procedure

  1. Add IC 74HC191 into ICBase-2 (74HC191).
  2. Connect Input-13 to Pin-19 (Input) of ICBase-2 (74HC191).
  3. Connect Input-12 to Pin-1 (Input) of ICBase-2 (74HC191).
  4. Connect Input-11 to Pin-14 (Input) of ICBase-2 (74HC191).
  5. Connect Input-10 to Pin-13 (Input) of ICBase-2 (74HC191).
  6. Connect Output-13 to Pin-3 (Output) of ICBase-2 (74HC191).
  7. Connect Output-12 to Pin-2 (Output) of ICBase-2 (74HC191).
  8. Connect Output-11 to Pin-6 (Output) of ICBase-2 (74HC191).
  9. Connect Output-10 to Pin-7 (Output) of ICBase-2 (74HC191).
  10. Connect GND Port to Pin-8 (Ground) of ICBase-2 (74HC191).
  11. Connect Manual clock Port to Pin-18 (Input) of ICBase-2 (74HC191).