New Circuit

Kirti
Kirti Deshmukh
• Created on Oct 24, 2026 • 0 • 0 • 1
New Circuit
100%

Integrated Circuits Used

Procedure

  1. Add IC 74LS76 into ICBase-1 (74LS76).
  2. Connect VCC Port to Pin-5 (VCC) of ICBase-1 (74LS76).
  3. Connect GND Port to Pin-17 (Ground) of ICBase-1 (74LS76).
  4. Connect Manual clock Port to Pin-1 (Input) of ICBase-1 (74LS76).
  5. Connect Manual clock Port to Pin-6 (Input) of ICBase-1 (74LS76).
  6. Connect Input-9 to Pin-2 (Input) of ICBase-1 (74LS76).
  7. Connect Input-9 to Pin-7 (Input) of ICBase-1 (74LS76).
  8. Connect Input-8 to Pin-3 (Input) of ICBase-1 (74LS76).
  9. Connect Input-8 to Pin-8 (Input) of ICBase-1 (74LS76).
  10. Connect Output-9 to Pin-19 (Output) of ICBase-1 (74LS76).
  11. Connect Output-8 to Pin-15 (Output) of ICBase-1 (74LS76).
  12. Connect Input-7 to Pin-13 (Input) of ICBase-1 (74LS76).
  13. Connect Input-7 to Pin-16 (Input) of ICBase-1 (74LS76).
  14. Connect Pin-4 (Input) of ICBase-1 (74LS76) to Pin-15 (Output) of ICBase-1 (74LS76).
  15. Connect Pin-20 (Input) of ICBase-1 (74LS76) to Pin-15 (Output) of ICBase-1 (74LS76).