New Circuit

janhavi
janhavi
• Created on Nov 4, 2026 • 0 • 0 • 1
New Circuit
100%

Integrated Circuits Used

Procedure

  1. Add IC 74LS191 into ICBase-2 (74LS191).
  2. Connect GND Port to Pin-8 (Ground) of ICBase-2 (74LS191).
  3. Connect VCC Port to Pin-20 (VCC) of ICBase-2 (74LS191).
  4. Connect Input-8 to Pin-1 (Input) of ICBase-2 (74LS191).
  5. Connect Pin-14 (Input) of ICBase-2 (74LS191) to Input-7.
  6. Connect Input-6 to Pin-13 (Input) of ICBase-2 (74LS191).
  7. Connect Input-9 to Pin-19 (Input) of ICBase-2 (74LS191).
  8. Connect Manual clock Port to Pin-18 (Input) of ICBase-2 (74LS191).
  9. Connect VCC Port to Pin-15 (Input) of ICBase-2 (74LS191).
  10. Connect GND Port to Pin-4 (Input) of ICBase-2 (74LS191).
  11. Connect Output-6 to Pin-2 (Output) of ICBase-2 (74LS191).
  12. Connect Output-7 to Pin-3 (Output) of ICBase-2 (74LS191).
  13. Connect Output-5 to Pin-6 (Output) of ICBase-2 (74LS191).
  14. Connect Output-4 to Pin-7 (Output) of ICBase-2 (74LS191).
  15. Connect VCC Port to Pin-5 (Input) of ICBase-2 (74LS191).