New Circuit

Purva Shekhar Bhavar
Purva Shekhar Bhavar
Created on Aug 19, 2026 0 0 1
New Circuit
100%

Integrated Circuits Used

Procedure

  1. Add IC 74LS74 into ICBase-1 (74LS74).
  2. Connect VCC Port to Pin-20 (VCC) of ICBase-1 (74LS74).
  3. Connect Output-10 to Pin-5 (Output) of ICBase-1 (74LS74).
  4. Connect Input-5 to Pin-2 (Input) of ICBase-1 (74LS74).
  5. Connect GND Port to Pin-7 (Ground) of ICBase-1 (74LS74).
  6. Connect Input-13 to Pin-1 (Input) of ICBase-1 (74LS74).
  7. Connect Manual clock Port to Pin-3 (Input) of ICBase-1 (74LS74).
  8. Connect Input-12 to Pin-4 (Input) of ICBase-1 (74LS74).