New Circuit

Nandyala Hemanjali
Nandyala Hemanjali
• Created on Aug 24, 2026 • 0 • 0 • 0
                     New Circuit
100%

Procedure

  1. Connect Input-13 to Pin-1 (Input) of ICBase-1 (74LS32).
  2. Connect Input-12 to Pin-2 (Input) of ICBase-1 (74LS32).
  3. Connect Output-11 to Pin-3 (Output) of ICBase-1 (74LS32).
  4. Connect GND Port to Pin-7 (Ground) of ICBase-1 (74LS32).
  5. Connect VCC Port to Pin-20 (VCC) of ICBase-1 (74LS32).
  6. Connect Input-9 to Pin-2 (Input) of ICBase-2 (74LS08).
  7. Connect Output-8 to Pin-3 (Output) of ICBase-2 (74LS08).
  8. Connect GND Port to Pin-7 (Ground) of ICBase-2 (74LS08).
  9. Connect VCC Port to Pin-20 (VCC) of ICBase-2 (74LS08).
  10. Add IC 74LS32 into ICBase-1 (74LS32).
  11. Add IC 74LS08 into ICBase-2 (74LS08).