synch up

Arif Khan
Arif Khan
• Created on Nov 3, 2026 • 0 • 0 • 1
synch up
100%

Integrated Circuits Used

Procedure

  1. Add IC 74LS76 into ICBase-1 (74LS76).
  2. Connect VCC Port to Pin-5 (VCC) of ICBase-1 (74LS76).
  3. Connect GND Port to Pin-17 (Ground) of ICBase-1 (74LS76).