test-1

vinutha
vinutha M S
Created on Dec 14, 2020 0 0 2
test-1
100%

Integrated Circuits Used

Procedure

  1. Add IC 74LS08 into ICBase-1 (74LS08).
  2. Add IC 74LS32 into ICBase-2 (74LS32).
  3. Connect Input-14 to Pin-1 (Input) of ICBase-1 (74LS08).
  4. Connect Input-13 to Pin-2 (Input) of ICBase-1 (74LS08).
  5. Connect Pin-1 (Input) of ICBase-2 (74LS32) to Pin-3 (Output) of ICBase-1 (74LS08).
  6. Connect Input-10 to Pin-4 (Input) of ICBase-1 (74LS08).
  7. Connect Input-9 to Pin-5 (Input) of ICBase-1 (74LS08).
  8. Connect Pin-2 (Input) of ICBase-2 (74LS32) to Pin-6 (Output) of ICBase-1 (74LS08).
  9. Connect GND Port to Pin-7 (Ground) of ICBase-1 (74LS08).
  10. Connect VCC Port to Pin-20 (VCC) of ICBase-1 (74LS08).
  11. Connect VCC Port to Pin-20 (VCC) of ICBase-2 (74LS32).
  12. Connect GND Port to Pin-7 (Ground) of ICBase-2 (74LS32).
  13. Connect Output-2 to Pin-3 (Output) of ICBase-2 (74LS32).