ss

Sowmya
Sowmya SK
• Created on Nov 3, 2022 • 0 • 0 • 1
ss
100%

Integrated Circuits Used

Description

s

Procedure

  1. Add IC 74LS04 into ICBase-2 (74LS04).
  2. Connect Input-15 to Pin-1 (Input) of ICBase-2 (74LS04).
  3. Connect Output-10 to Pin-2 (Output) of ICBase-2 (74LS04).
  4. Connect GND Port to Pin-7 (Ground) of ICBase-2 (74LS04).
  5. Connect VCC Port to Pin-20 (VCC) of ICBase-2 (74LS04).