New Circuit

Kush Khandelwal
Kush Khandelwal
• Created on Jul 21, 2026 • 0 • 0 • 2
New Circuit
100%

Integrated Circuits Used

Procedure

  1. Connect GND Port to Pin-7 (Ground) of ICBase-1 (74LS11).
  2. Connect Input-0 to Pin-1 (Input) of ICBase-1 (74LS11).
  3. Connect Input-1 to Pin-2 (Input) of ICBase-1 (74LS11).
  4. Add IC 74LS04 into ICBase-2 (74LS04).
  5. Connect GND Port to Pin-7 (Ground) of ICBase-2 (74LS04).
  6. Connect Pin-1 (Input) of ICBase-2 (74LS04) to Pin-3 (Input) of ICBase-1 (74LS11).
  7. Connect Output-6 to Pin-2 (Output) of ICBase-2 (74LS04).
  8. Add IC 74LS11 into ICBase-1 (74LS11).
  9. Connect VCC Port to Pin-20 (VCC) of ICBase-1 (74LS11).
  10. Connect VCC Port to Pin-20 (VCC) of ICBase-2 (74LS04).