absorption law

M.Jeya priya
M.Jeya priya
• Created on Oct 30, 2026 • 0 • 0 • 0
absorption law
100%

Procedure

  1. Connect GND Port to Pin-7 (Ground) of ICBase-1 (74LS08).
  2. Connect GND Port to Pin-7 (Ground) of ICBase-2 (74LS32).
  3. Connect VCC Port to Pin-20 (VCC) of ICBase-1 (74LS08).
  4. Connect VCC Port to Pin-20 (VCC) of ICBase-2 (74LS32).
  5. Add IC 74LS32 into ICBase-2 (74LS32).
  6. Connect Input-11 to Pin-1 (Input) of ICBase-1 (74LS08).
  7. Add IC 74LS08 into ICBase-1 (74LS08).
  8. Connect Input-10 to Pin-2 (Input) of ICBase-1 (74LS08).
  9. Connect Pin-2 (Input) of ICBase-2 (74LS32) to Pin-3 (Output) of ICBase-1 (74LS08).
  10. Connect Input-11 to Pin-1 (Input) of ICBase-2 (74LS32).
  11. Connect Output-8 to Pin-3 (Output) of ICBase-2 (74LS32).