New Circuit

MIRDHULA TG
MIRDHULA TG
• Created on Nov 3, 2026 • 0 • 0 • 2
New Circuit
100%

Integrated Circuits Used

Procedure

  1. Add IC 74LS90 into ICBase-2 (74LS90).
  2. Connect Manual clock Port to Pin-1 (Input) of ICBase-2 (74LS90).
  3. Connect Manual clock Port to Pin-20 (Input) of ICBase-2 (74LS90).
  4. Connect GND Port to Pin-16 (Ground) of ICBase-2 (74LS90).
  5. Connect VCC Port to Pin-5 (VCC) of ICBase-2 (74LS90).
  6. Connect Input-0 to Pin-19 (Input & Output) of ICBase-2 (74LS90).
  7. Connect Input-1 to Pin-16 (Ground) of ICBase-2 (74LS90).
  8. Add IC 74LS93 into ICBase-3 (74LS93).
  9. Connect Manual clock Port to Pin-1 (Input) of ICBase-3 (74LS93).
  10. Connect Manual clock Port to Pin-19 (Input & Output) of ICBase-3 (74LS93).