New Circuit

MUTHUVEL R
MUTHUVEL R
• Created on Nov 2, 2026 • 0 • 0 • 1
New Circuit
100%

Integrated Circuits Used

Procedure

  1. Add IC 74LS04 into ICBase-2 (74LS04).
  2. Connect VCC Port to Pin-20 (VCC) of ICBase-2 (74LS04).
  3. Connect GND Port to Pin-7 (Ground) of ICBase-2 (74LS04).
  4. Connect Input-6 to Pin-1 (Input) of ICBase-2 (74LS04).
  5. Connect Output-6 to Pin-2 (Output) of ICBase-2 (74LS04).