Experiment 3

Sindhu
Sindhu SG
Created on Feb 1, 2021 0 0 2
Experiment 3
100%

Integrated Circuits Used

Procedure

  1. Add IC 74LS04 into ICBase-2 (74LS04).
  2. Add IC 74LS08 into ICBase-3 (74LS08).
  3. Connect VCC Port to Pin-20 (VCC) of ICBase-3 (74LS08).
  4. Connect VCC Port to Pin-20 (VCC) of ICBase-2 (74LS04).
  5. Connect GND Port to Pin-7 (Ground) of ICBase-3 (74LS08).
  6. Connect GND Port to Pin-7 (Ground) of ICBase-2 (74LS04).
  7. Connect Pin-1 (Input) of ICBase-3 (74LS08) to Input-1.
  8. Connect Input-2 to Pin-1 (Input) of ICBase-2 (74LS04).
  9. Connect Pin-2 (Input) of ICBase-3 (74LS08) to Pin-2 (Output) of ICBase-2 (74LS04).
  10. Connect Output-0 to Pin-3 (Output) of ICBase-3 (74LS08).