New Circuit

Om
Om
Created on Apr 26, 2026 0 0 1
New Circuit
100%

Integrated Circuits Used

Procedure

  1. Add IC 74LS11 into ICBase-2 (74LS11).
  2. Add IC 74LS11 into ICBase-3 (74LS11).
  3. Connect VCC Port to Pin-20 (VCC) of ICBase-2 (74LS11).
  4. Connect Pin-20 (VCC) of ICBase-3 (74LS11) to VCC Port.
  5. Connect GND Port to Pin-7 (Ground) of ICBase-2 (74LS11).
  6. Connect GND Port to Pin-7 (Ground) of ICBase-3 (74LS11).