Tejas

Mohak Bhowmik
Mohak Bhowmik
Created on Apr 20, 2026 0 0 0
Tejas
100%

Procedure

  1. Add IC 74LS04 into ICBase-3 (74LS04).
  2. Connect Input-2 to Pin-1 (Input) of ICBase-3 (74LS04).
  3. Connect Output-1 to Pin-2 (Output) of ICBase-3 (74LS04).
  4. Connect Pin-20 (VCC) of ICBase-3 (74LS04) to VCC Port.
  5. Connect GND Port to Pin-7 (Ground) of ICBase-3 (74LS04).