New Circuit

Tarun
Tarun
Created on Apr 15, 2026 0 0 1
New Circuit
100%

Integrated Circuits Used

Procedure

  1. Connect Input-1 to Pin-1 (Input) of ICBase-1 (74LS74).
  2. Connect Input-15 to Pin-2 (Input) of ICBase-1 (74LS74).
  3. Connect Pin-3 (Input) of ICBase-1 (74LS74) to Manual clock Port.
  4. Connect Pin-2 (Input & Output) of ICBase-2 to Pin-4 (Input) of ICBase-1 (74LS74).
  5. Connect Pin-1 (Input) of ICBase-1 (74LS74) to Pin-1 (Input & Output) of ICBase-2.
  6. Connect Pin-3 (Input) of ICBase-1 (74LS74) to Pin-3 (Input & Output) of ICBase-2.
  7. Connect VCC Port to Pin-20 (VCC) of ICBase-1 (74LS74).
  8. Add IC 74LS74 into ICBase-1 (74LS74).