ckt for check

Sheetal Singh
Sheetal Singh
Created on Apr 9, 2026 0 0 1
ckt for check
100%

Integrated Circuits Used

Procedure

  1. Connect VCC Port to Pin-20 (VCC) of ICBase-2 (74LS00).
  2. Connect Pin-1 (Input) of ICBase-2 (74LS00) to Input-7.
  3. Connect GND Port to Pin-7 (Ground) of ICBase-2 (74LS00).
  4. Connect Pin-2 (Input) of ICBase-2 (74LS00) to Input-8.
  5. Connect Pin-3 (Output) of ICBase-2 (74LS00) to Output-5.
  6. Add IC 74LS00 into ICBase-2 (74LS00).