New Circuit

Adi
Adi
Created on Apr 25, 2026 0 0 1
New Circuit
100%

Integrated Circuits Used

Procedure

  1. Add IC 74LS00 into ICBase-1 (74LS00).
  2. Add IC 74LS00 into ICBase-2 (74LS00).
  3. Connect Pin-7 (Ground) of ICBase-2 (74LS00) to Pin-7 (Ground) of ICBase-1 (74LS00).
  4. Connect Pin-7 (Input & Output) of ICBase-3 to Pin-7 (Ground) of ICBase-2 (74LS00).
  5. Connect VCC Port to Pin-20 (Input & Output) of ICBase-3.
  6. Connect GND Port to Pin-7 (Input & Output) of ICBase-3.
  7. Connect Pin-20 (Input & Output) of ICBase-3 to Pin-20 (VCC) of ICBase-2 (74LS00).
  8. Connect Pin-20 (VCC) of ICBase-2 (74LS00) to Pin-20 (VCC) of ICBase-1 (74LS00).