New Circuit

Mueez Mujtaba
Mueez Mujtaba
Created on Mar 27, 2026 0 0 1
New Circuit
100%

Integrated Circuits Used

Procedure

  1. Connect VCC Port to Pin-20 (VCC) of ICBase-3 (74LS32).
  2. Connect Input-10 to Pin-1 (Input) of ICBase-3 (74LS32).
  3. Connect Input-7 to Pin-2 (Input) of ICBase-3 (74LS32).
  4. Connect Output-7 to Pin-3 (Output) of ICBase-3 (74LS32).
  5. Connect GND Port to Pin-7 (Ground) of ICBase-3 (74LS32).
  6. Add IC 74LS32 into ICBase-3 (74LS32).