New Circuit

Arohi Govindu
Arohi Govindu
Created on Apr 21, 2026 0 0 2
New Circuit
100%

Integrated Circuits Used

Procedure

  1. Add IC 74LS74 into ICBase-1 (74LS74).
  2. Connect VCC Port to Pin-14 (Output) of ICBase-1 (74LS74).
  3. Connect GND Port to Pin-7 (Ground) of ICBase-1 (74LS74).
  4. Connect Pin-3 (Input) of ICBase-1 (74LS74) to Clock port of 0.5Hz frequency.
  5. Add IC 74LS04 into ICBase-2 (74LS04).
  6. Connect VCC Port to Pin-1 (Input) of ICBase-1 (74LS74).
  7. Connect VCC Port to Pin-4 (Input) of ICBase-1 (74LS74).
  8. Connect Pin-2 (Input) of ICBase-1 (74LS74) to Pin-6 (Output) of ICBase-1 (74LS74).
  9. Connect Output-0 to Pin-5 (Output) of ICBase-1 (74LS74).