New Circuit

Vrishti Wadhwani
Vrishti Wadhwani
Created on Apr 19, 2026 0 0 3
New Circuit
100%

Integrated Circuits Used

Procedure

  1. Add IC 74LS76 into ICBase-1 (74LS76).
  2. Add IC 74LS76 into ICBase-2 (74LS76).
  3. Add IC 74LS04 into ICBase-3 (74LS04).
  4. Add IC 74LS08 into ICBase-4 (74LS08).
  5. Connect VCC Port to Pin-5 (VCC) of ICBase-1 (74LS76).
  6. Connect VCC Port to Pin-5 (VCC) of ICBase-2 (74LS76).
  7. Connect VCC Port to Pin-20 (VCC) of ICBase-3 (74LS04).
  8. Connect VCC Port to Pin-20 (VCC) of ICBase-4 (74LS08).
  9. Connect GND Port to Pin-17 (Ground) of ICBase-1 (74LS76).
  10. Connect GND Port to Pin-17 (Ground) of ICBase-2 (74LS76).
  11. Connect GND Port to Pin-7 (Ground) of ICBase-3 (74LS04).
  12. Connect Pin-7 (Ground) of ICBase-4 (74LS08) to GND Port.
  13. Connect VCC Port to Pin-4 (Input) of ICBase-1 (74LS76).
  14. Connect VCC Port to Pin-20 (Input) of ICBase-1 (74LS76).
  15. Connect VCC Port to Pin-13 (Input) of ICBase-1 (74LS76).