New Circuit

Shuchitam Mishra
Shuchitam Mishra
Created on Apr 18, 2026 0 0 1
New Circuit
100%

Integrated Circuits Used

Procedure

  1. Add IC 74LS191 into ICBase-3 (74LS191).
  2. Connect GND Port to Pin-8 (Ground) of ICBase-3 (74LS191).
  3. Connect VCC Port to Pin-20 (VCC) of ICBase-3 (74LS191).
  4. Connect Input-0 to Pin-1 (Input) of ICBase-3 (74LS191).
  5. Connect Output-1 to Pin-2 (Output) of ICBase-3 (74LS191).
  6. Connect Pin-16 (Output) of ICBase-3 (74LS191) to Pin-4 (Input) of ICBase-3 (74LS191).
  7. Connect Input-11 to Pin-5 (Input) of ICBase-3 (74LS191).
  8. Connect Pin-1 (Input & Output) of ICBase-2 to Pin-6 (Output) of ICBase-3 (74LS191).
  9. Connect Input-10 to Pin-1 (Input & Output) of ICBase-2.
  10. Connect Pin-3 (Input & Output) of ICBase-2 to Pin-7 (Output) of ICBase-3 (74LS191).
  11. Connect Input-9 to Pin-3 (Input & Output) of ICBase-2.
  12. Connect Input-4 to Pin-13 (Input) of ICBase-3 (74LS191).