New Circuit

Kabeer
Kabeer
Created on Apr 22, 2026 0 0 1
New Circuit
100%

Integrated Circuits Used

Procedure

  1. Add IC 74LS90 into ICBase-1 (74LS90).
  2. Add IC 74LS90 into ICBase-2 (74LS90).
  3. Connect Pin-5 (VCC) of ICBase-1 (74LS90) to Manual clock Port.
  4. Connect Manual clock Port to Pin-16 (Ground) of ICBase-1 (74LS90).
  5. Connect Manual clock Port to Pin-5 (VCC) of ICBase-2 (74LS90).
  6. Connect Manual clock Port to Pin-16 (Ground) of ICBase-2 (74LS90).
  7. Connect Pin-18 (Output) of ICBase-1 (74LS90) to Pin-1 (Input) of ICBase-1 (74LS90).
  8. Connect Pin-18 (Output) of ICBase-2 (74LS90) to Pin-1 (Input) of ICBase-2 (74LS90).
  9. Connect Pin-20 (Input) of ICBase-2 (74LS90) to Pin-17 (Output) of ICBase-1 (74LS90).