FCASD PROJECT

Akanksha
Akanksha
Created on Apr 22, 2026 0 0 1
FCASD PROJECT
100%

Integrated Circuits Used

Procedure

  1. Add IC 74LS90 into ICBase-1 (74LS90).
  2. Add IC 74LS90 into ICBase-2 (74LS90).
  3. Connect Pin-5 (VCC) of ICBase-1 (74LS90) to VCC Port.
  4. Connect Pin-19 (Input & Output) of ICBase-1 (74LS90) to GND Port.