New Circuit

Hrugwed
Hrugwed
Created on Apr 18, 2026 0 0 1
New Circuit
100%

Integrated Circuits Used

Procedure

  1. Add IC 74LS11 into ICBase-3 (74LS11).
  2. Connect GND Port to Pin-7 (Ground) of ICBase-3 (74LS11).
  3. Connect VCC Port to Pin-20 (VCC) of ICBase-3 (74LS11).
  4. Add IC 74LS11 into ICBase-2 (74LS11).
  5. Connect VCC Port to Pin-20 (VCC) of ICBase-2 (74LS11).
  6. Connect GND Port to Pin-7 (Ground) of ICBase-2 (74LS11).
  7. Connect Input-0 to Pin-1 (Input) of ICBase-3 (74LS11).
  8. Connect Input-0 to Pin-1 (Input) of ICBase-2 (74LS11).
  9. Connect Input-1 to Pin-2 (Input) of ICBase-3 (74LS11).
  10. Connect Input-1 to Pin-2 (Input) of ICBase-2 (74LS11).
  11. Connect Input-2 to Pin-19 (Input) of ICBase-3 (74LS11).
  12. Connect Input-3 to Pin-19 (Input) of ICBase-2 (74LS11).
  13. Connect Output-0 to Pin-18 (Output) of ICBase-3 (74LS11).
  14. Connect Output-1 to Pin-18 (Output) of ICBase-2 (74LS11).