New Circuit

Aarushi Sudhakar
Aarushi Sudhakar
Created on Apr 8, 2026 0 0 1
New Circuit
100%

Integrated Circuits Used

Procedure

  1. Add IC 74LS76 into ICBase-2 (74LS76).
  2. Connect GND Port to Pin-13 (Input) of ICBase-2 (74LS76).
  3. Connect VCC Port to Pin-2 (Input) of ICBase-2 (74LS76).
  4. Connect VCC Port to Pin-3 (Input) of ICBase-2 (74LS76).
  5. Connect Pin-1 (Input) of ICBase-2 (74LS76) to Clock port of 1Hz frequency.
  6. Connect Pin-6 (Input) of ICBase-2 (74LS76) to Pin-17 (Ground) of ICBase-2 (74LS76).