New Circuit

Karan Damah
Karan Damah
Created on Apr 18, 2026 0 0 1
New Circuit
100%

Integrated Circuits Used

Procedure

  1. Add IC 74LS90 into ICBase-2 (74LS90).
  2. Connect Pin-5 (VCC) of ICBase-2 (74LS90) to VCC Port.
  3. Connect Pin-16 (Ground) of ICBase-2 (74LS90) to GND Port.
  4. Connect GND Port to Pin-2 (Input) of ICBase-2 (74LS90).
  5. Connect GND Port to Pin-3 (Input) of ICBase-2 (74LS90).
  6. Connect GND Port to Pin-6 (Input) of ICBase-2 (74LS90).
  7. Connect GND Port to Pin-7 (Input) of ICBase-2 (74LS90).
  8. Connect Pin-20 (Input) of ICBase-2 (74LS90) to Manual clock Port.
  9. Connect Pin-1 (Input) of ICBase-2 (74LS90) to Pin-18 (Output) of ICBase-2 (74LS90).
  10. Connect Output-15 to Pin-17 (Output) of ICBase-2 (74LS90).
  11. Connect Output-14 to Pin-14 (Output) of ICBase-2 (74LS90).
  12. Connect Output-13 to Pin-15 (Output) of ICBase-2 (74LS90).
  13. Connect Output-12 to Pin-18 (Output) of ICBase-2 (74LS90).