New Circuit

Parth Nitesh Mahajan
Parth Nitesh Mahajan
Created on Mar 17, 2026 0 0 1
New Circuit
100%

Integrated Circuits Used

Procedure

  1. Add IC 74LS86 into ICBase-1 (74LS86).
  2. Connect Pin-20 (VCC) of ICBase-1 (74LS86) to VCC Port.
  3. Connect GND Port to Pin-7 (Ground) of ICBase-1 (74LS86).
  4. Connect Output-1 to Input-1.
  5. Connect Output-3 to Pin-6 (Output) of ICBase-1 (74LS86).
  6. Connect Input-3 to Pin-5 (Input) of ICBase-1 (74LS86).