New Circuit

Aditya
Aditya
Created on Apr 19, 2026 0 0 1
New Circuit
100%

Integrated Circuits Used

Procedure

  1. Add IC 74LS76 into ICBase-1 (74LS76).
  2. Add IC 74LS76 into ICBase-2 (74LS76).
  3. Connect Pin-5 (VCC) of ICBase-1 (74LS76) to Manual clock Port.
  4. Connect Pin-5 (VCC) of ICBase-2 (74LS76) to Pin-5 (VCC) of ICBase-1 (74LS76).
  5. Connect Pin-5 (Input & Output) of ICBase-3 to Pin-5 (VCC) of ICBase-2 (74LS76).
  6. Connect VCC Port to Pin-5 (VCC) of ICBase-1 (74LS76).