New Circuit

M. Awais Farooq
M. Awais Farooq
Created on Mar 26, 2026 1 0 1
New Circuit
100%

Integrated Circuits Used

Procedure

  1. Connect GND Port to Pin-7 (Input & Output) of ICBase-2.
  2. Connect GND Port to Pin-7 (Ground) of ICBase-3 (74LS08).
  3. Connect VCC Port to Pin-20 (Input & Output) of ICBase-2.
  4. Connect VCC Port to Pin-20 (VCC) of ICBase-3 (74LS08).
  5. Connect Input-10 to Pin-1 (Input & Output) of ICBase-2.
  6. Connect Input-9 to Pin-2 (Input & Output) of ICBase-2.
  7. Connect Output-9 to Pin-3 (Input & Output) of ICBase-2.
  8. Connect Pin-1 (Input) of ICBase-3 (74LS08) to Pin-1 (Input & Output) of ICBase-2.
  9. Connect Input-9 to Pin-2 (Input) of ICBase-3 (74LS08).
  10. Connect Output-5 to Pin-3 (Output) of ICBase-3 (74LS08).
  11. Add IC 74LS08 into ICBase-3 (74LS08).