New Circuit

Rutuja Wagdare
Rutuja Wagdare
Created on Mar 16, 2026 0 0 2
New Circuit
100%

Integrated Circuits Used

Procedure

  1. Add IC 74LS74 into ICBase-2 (74LS74).
  2. Add IC 74LS08 into ICBase-3 (74LS08).
  3. Connect GND Port to Pin-7 (Ground) of ICBase-2 (74LS74).
  4. Connect GND Port to Pin-7 (Ground) of ICBase-3 (74LS08).
  5. Connect Pin-20 (VCC) of ICBase-2 (74LS74) to VCC Port.
  6. Connect VCC Port to Pin-20 (VCC) of ICBase-3 (74LS08).
  7. Connect VCC Port to Pin-1 (Input) of ICBase-2 (74LS74).
  8. Connect Manual clock Port to Pin-3 (Input) of ICBase-2 (74LS74).
  9. Connect VCC Port to Pin-4 (Input) of ICBase-2 (74LS74).
  10. Connect Input-0 to Pin-2 (Input) of ICBase-2 (74LS74).
  11. Connect Pin-1 (Input) of ICBase-3 (74LS08) to Pin-5 (Output) of ICBase-2 (74LS74).
  12. Connect VCC Port to Pin-19 (Input) of ICBase-2 (74LS74).
  13. Connect Pin-3 (Output) of ICBase-3 (74LS08) to Pin-18 (Input) of ICBase-2 (74LS74).
  14. Connect Manual clock Port to Pin-17 (Input) of ICBase-2 (74LS74).
  15. Connect VCC Port to Pin-16 (Input) of ICBase-2 (74LS74).
  16. Connect Pin-4 (Input) of ICBase-3 (74LS08) to Pin-15 (Output) of ICBase-2 (74LS74).
  17. Connect Input-0 to Pin-2 (Input) of ICBase-3 (74LS08).
  18. Connect Input-0 to Pin-5 (Input) of ICBase-3 (74LS08).
  19. Connect Output-0 to Pin-6 (Output) of ICBase-3 (74LS08).