New Circuit

Moksh jain
Moksh jain
Created on Apr 18, 2026 0 0 1
New Circuit
100%

Integrated Circuits Used

Procedure

  1. Add IC 74LS76 into ICBase-2 (74LS76).
  2. Add IC 74LS76 into ICBase-3 (74LS76).
  3. Connect VCC Port to Pin-5 (VCC) of ICBase-2 (74LS76).
  4. Connect GND Port to Pin-17 (Ground) of ICBase-2 (74LS76).
  5. Connect Manual clock Port to Pin-1 (Input) of ICBase-2 (74LS76).
  6. Connect Manual clock Port to Pin-6 (Input) of ICBase-2 (74LS76).
  7. Connect VCC Port to Pin-2 (Input) of ICBase-2 (74LS76).
  8. Connect VCC Port to Pin-7 (Input) of ICBase-2 (74LS76).
  9. Connect Input-1 to Pin-3 (Input) of ICBase-2 (74LS76).
  10. Connect Input-1 to Pin-8 (Input) of ICBase-2 (74LS76).
  11. Connect VCC Port to Pin-4 (Input) of ICBase-2 (74LS76).
  12. Connect VCC Port to Pin-13 (Input) of ICBase-2 (74LS76).