New Circuit

Atharva Iche
Atharva Iche
Created on Apr 7, 2026 0 0 1
New Circuit
100%

Integrated Circuits Used

Procedure

  1. Add IC 74LS76 into ICBase-3 (74LS76).
  2. Connect Pin-17 (Ground) of ICBase-3 (74LS76) to GND Port.
  3. Connect Pin-5 (VCC) of ICBase-3 (74LS76) to VCC Port.
  4. Connect Input-4 to Pin-2 (Input) of ICBase-3 (74LS76).
  5. Connect Input-3 to Pin-3 (Input) of ICBase-3 (74LS76).
  6. Connect Pin-20 (Input) of ICBase-3 (74LS76) to Input-2.
  7. Connect Clock port of 1Hz frequency to Pin-1 (Input) of ICBase-3 (74LS76).
  8. Connect Input-1 to Pin-4 (Input) of ICBase-3 (74LS76).
  9. Connect Pin-18 (Output) of ICBase-3 (74LS76) to Output-0.
  10. Connect Output-1 to Pin-19 (Output) of ICBase-3 (74LS76).