Project Circuit

Manas Varade
Manas Varade
Created on Apr 20, 2026 0 0 3
Project Circuit
100%

Integrated Circuits Used

Procedure

  1. Add IC 74LS74 into ICBase-3 (74LS74).
  2. Add IC 74LS74 into ICBase-2 (74LS74).
  3. Add IC 74LS27 into ICBase-4 (74LS27).
  4. Add IC 74LS04 into ICBase-5 (74LS04).
  5. Connect VCC Port to Pin-14 (Output) of ICBase-2 (74LS74).
  6. Connect VCC Port to Pin-14 (Output) of ICBase-3 (74LS74).
  7. Connect VCC Port to Pin-14 (Output) of ICBase-4 (74LS27).
  8. Connect VCC Port to Pin-14 (Output) of ICBase-5 (74LS04).
  9. Connect GND Port to Pin-7 (Ground) of ICBase-2 (74LS74).
  10. Connect GND Port to Pin-7 (Ground) of ICBase-3 (74LS74).
  11. Connect GND Port to Pin-7 (Ground) of ICBase-4 (74LS27).
  12. Connect GND Port to Pin-7 (Ground) of ICBase-5 (74LS04).
  13. Connect VCC Port to Pin-1 (Input) of ICBase-2 (74LS74).
  14. Connect Manual clock Port to Pin-3 (Input) of ICBase-2 (74LS74).
  15. Connect VCC Port to Pin-4 (Input) of ICBase-2 (74LS74).
  16. Connect Seven segment display 1 to Pin-5 (Output) of ICBase-2 (74LS74).
  17. Connect Pin-1 (Input) of ICBase-5 (74LS04) to Pin-5 (Output) of ICBase-2 (74LS74).