New Circuit

Arjun Shringarpure
Arjun Shringarpure
Created on Apr 13, 2026 0 0 1
New Circuit
100%

Integrated Circuits Used

Procedure

  1. Add IC 74LS76 into ICBase-1 (74LS76).
  2. Add IC 74LS76 into ICBase-2 (74LS76).
  3. Connect VCC Port to Pin-5 (VCC) of ICBase-1 (74LS76).
  4. Connect VCC Port to Pin-5 (VCC) of ICBase-2 (74LS76).
  5. Connect Pin-20 (Input) of ICBase-1 (74LS76) to Input-1.
  6. Connect Pin-4 (Input) of ICBase-1 (74LS76) to Input-1.
  7. Connect GND Port to Pin-17 (Ground) of ICBase-1 (74LS76).
  8. Connect GND Port to Pin-17 (Ground) of ICBase-2 (74LS76).
  9. Connect Pin-13 (Input) of ICBase-2 (74LS76) to Input-1.
  10. Connect Pin-16 (Input) of ICBase-2 (74LS76) to Input-1.
  11. Connect Output-0 to Pin-19 (Output) of ICBase-1 (74LS76).