New Circuit

gowtham
gowtham
Created on Apr 2, 2026 0 0 2
New Circuit
100%

Integrated Circuits Used

Procedure

  1. Add IC 74LS00 into ICBase-1 (74LS00).
  2. Add IC 74LS10 into ICBase-2 (74LS10).
  3. Connect Pin-20 (VCC) of ICBase-1 (74LS00) to VCC Port.
  4. Connect VCC Port to Pin-20 (VCC) of ICBase-2 (74LS10).
  5. Connect GND Port to Pin-7 (Ground) of ICBase-2 (74LS10).
  6. Connect GND Port to Pin-7 (Ground) of ICBase-1 (74LS00).
  7. Connect Pin-19 (Input) of ICBase-2 (74LS10) to Manual clock Port.
  8. Connect Pin-1 (Input) of ICBase-2 (74LS10) to Input-9.
  9. Connect Pin-2 (Input) of ICBase-2 (74LS10) to Pin-3 (Output) of ICBase-1 (74LS00).
  10. Connect Pin-16 (Input) of ICBase-2 (74LS10) to Manual clock Port.
  11. Connect Pin-17 (Input) of ICBase-2 (74LS10) to Input-8.
  12. Connect Pin-16 (Input) of ICBase-1 (74LS00) to Pin-18 (Output) of ICBase-2 (74LS10).
  13. Connect Pin-17 (Output) of ICBase-1 (74LS00) to Pin-3 (Input) of ICBase-2 (74LS10).
  14. Connect Pin-2 (Input) of ICBase-1 (74LS00) to Pin-6 (Output) of ICBase-2 (74LS10).
  15. Connect Pin-1 (Input) of ICBase-1 (74LS00) to Pin-18 (Output) of ICBase-2 (74LS10).