New Circuit

shaik suhab khan
shaik suhab khan
Created on Feb 16, 2026 0 0 3
New Circuit
100%

Integrated Circuits Used

Procedure

  1. Add IC 74LS04 into ICBase-2 (74LS04).
  2. Add IC 74LS08 into ICBase-3 (74LS08).
  3. Add IC 74LS32 into ICBase-4 (74LS32).
  4. Connect Pin-7 (Ground) of ICBase-4 (74LS32) to GND Port.
  5. Connect Pin-20 (VCC) of ICBase-4 (74LS32) to VCC Port.
  6. Connect VCC Port to Pin-4 (Input) of ICBase-3 (74LS08).
  7. Connect Pin-20 (VCC) of ICBase-2 (74LS04) to Pin-2 (Output) of ICBase-2 (74LS04).
  8. Connect Pin-20 (VCC) of ICBase-4 (74LS32) to Pin-1 (Input) of ICBase-4 (74LS32).
  9. Connect Pin-1 (Input) of ICBase-2 (74LS04) to Input-9.