New Circuit

PALURI VENKATA SAI KUMAR
PALURI VENKATA SAI KUMAR
Created on Apr 3, 2026 0 0 2
New Circuit
100%

Integrated Circuits Used

Procedure

  1. Add IC 74LS04 into ICBase-1 (74LS04).
  2. Add IC 74LS00 into ICBase-2 (74LS00).
  3. Connect Pin-1 (Input) of ICBase-1 (74LS04) to Input-15.
  4. Connect Manual clock Port to Pin-2 (Input) of ICBase-2 (74LS00).