New Circuit

TIRTH PATEL
TIRTH PATEL
Created on Feb 19, 2026 0 0 1
New Circuit
100%

Integrated Circuits Used

Procedure

  1. Add IC 74LS00 into ICBase-1 (74LS00).
  2. Connect Pin-20 (VCC) of ICBase-1 (74LS00) to VCC Port.
  3. Connect GND Port to Pin-7 (Ground) of ICBase-1 (74LS00).
  4. Connect Pin-1 (Input) of ICBase-1 (74LS00) to Input-1.
  5. Connect Pin-2 (Input) of ICBase-1 (74LS00) to Input-2.
  6. Connect Output-3 to Pin-3 (Output) of ICBase-1 (74LS00).