New Circuit

lochana
lochana
Created on Jan 1, 2026 0 0 1
New Circuit
100%

Integrated Circuits Used

Procedure

  1. Add IC 74LS74 into ICBase-1 (74LS74).
  2. Add IC 74LS74 into ICBase-2 (74LS74).
  3. Connect Manual clock Port to Pin-1 (Input) of ICBase-1 (74LS74).
  4. Connect Input-11 to Pin-2 (Input) of ICBase-1 (74LS74).
  5. Connect Input-9 to Pin-3 (Input) of ICBase-1 (74LS74).