New Circuit

lochana
lochana
Created on Dec 3, 2025 0 0 1
New Circuit
100%

Integrated Circuits Used

Procedure

  1. Add IC 74LS74 into ICBase-1 (74LS74).
  2. Add IC 74LS74 into ICBase-2 (74LS74).
  3. Connect GND Port to Pin-7 (Ground) of ICBase-1 (74LS74).
  4. Connect VCC Port to Pin-14 (Output) of ICBase-1 (74LS74).
  5. Connect Manual clock Port to Pin-3 (Input) of ICBase-1 (74LS74).
  6. Connect Input-1 to Pin-2 (Input) of ICBase-1 (74LS74).
  7. Connect Input-11 to Pin-1 (Input) of ICBase-1 (74LS74).
  8. Connect Input-10 to Pin-4 (Input) of ICBase-1 (74LS74).