New Circuit

Keerthana A
Keerthana A
Created on Dec 1, 2025 0 0 1
New Circuit
100%

Integrated Circuits Used

Procedure

  1. Add IC 74LS74 into ICBase-1 (74LS74).
  2. Add IC 74LS74 into ICBase-2 (74LS74).
  3. Connect Input-12 to Pin-1 (Input) of ICBase-1 (74LS74).
  4. Connect GND Port to Pin-7 (Ground) of ICBase-1 (74LS74).
  5. Connect GND Port to Pin-7 (Ground) of ICBase-2 (74LS74).
  6. Connect VCC Port to Pin-20 (VCC) of ICBase-1 (74LS74).
  7. Connect VCC Port to Pin-20 (VCC) of ICBase-2 (74LS74).
  8. Connect Input-11 to Pin-2 (Input) of ICBase-2 (74LS74).
  9. Connect Manual clock Port to Pin-3 (Input) of ICBase-1 (74LS74).
  10. Connect Manual clock Port to Pin-3 (Input) of ICBase-2 (74LS74).
  11. Connect Input-9 to Pin-4 (Input) of ICBase-1 (74LS74).
  12. Connect Output-4 to Pin-5 (Output) of ICBase-1 (74LS74).
  13. Connect Input-6 to Pin-2 (Input) of ICBase-1 (74LS74).