New Circuit

Keerthana A
Keerthana A
Created on Dec 11, 2025 0 0 1
New Circuit
100%

Integrated Circuits Used

Procedure

  1. Add IC 74LS74 into ICBase-1 (74LS74).
  2. Add IC 74LS74 into ICBase-2 (74LS74).
  3. Connect Input-4 to Pin-1 (Input) of ICBase-1 (74LS74).
  4. Connect Input-0 to Pin-2 (Input) of ICBase-1 (74LS74).
  5. Connect Manual clock Port to Pin-3 (Input) of ICBase-1 (74LS74).
  6. Connect Input-5 to Pin-4 (Input) of ICBase-1 (74LS74).
  7. Connect Output-0 to Pin-5 (Output) of ICBase-1 (74LS74).
  8. Connect Pin-7 (Ground) of ICBase-1 (74LS74) to GND Port.
  9. Connect Pin-18 (Input) of ICBase-1 (74LS74) to Pin-5 (Output) of ICBase-1 (74LS74).
  10. Connect Output-1 to Pin-15 (Output) of ICBase-1 (74LS74).
  11. Connect Pin-2 (Input) of ICBase-2 (74LS74) to Pin-15 (Output) of ICBase-1 (74LS74).