New Circuit

Incharra .M
Incharra .M
Created on Dec 18, 2025 0 0 1
New Circuit
100%

Integrated Circuits Used

Procedure

  1. Add IC 74LS76 into ICBase-1 (74LS76).
  2. Add IC 74LS76 into ICBase-2 (74LS76).
  3. Connect Manual clock Port to Pin-1 (Input) of ICBase-1 (74LS76).
  4. Connect VCC Port to Pin-2 (Input) of ICBase-1 (74LS76).
  5. Connect VCC Port to Pin-3 (Input) of ICBase-1 (74LS76).