New Circuit

Incharra .M
Incharra .M
Created on Dec 16, 2025 0 0 1
New Circuit
100%

Integrated Circuits Used

Procedure

  1. Connect Pin-5 (VCC) of ICBase-1 (74LS83) to VCC Port.
  2. Add IC 74LS83 into ICBase-1 (74LS83).
  3. Connect Pin-16 (Ground) of ICBase-1 (74LS83) to GND Port.
  4. Connect Input-12 to Pin-1 (Input) of ICBase-1 (74LS83).
  5. Connect Input-11 to Pin-3 (Input) of ICBase-1 (74LS83).
  6. Connect Input-10 to Pin-8 (Input) of ICBase-1 (74LS83).
  7. Connect Input-9 to Pin-14 (Input) of ICBase-1 (74LS83).
  8. Connect Input-7 to Pin-20 (Input) of ICBase-1 (74LS83).
  9. Connect Input-6 to Pin-4 (Input) of ICBase-1 (74LS83).
  10. Connect Input-5 to Pin-7 (Input) of ICBase-1 (74LS83).
  11. Connect Input-4 to Pin-15 (Input) of ICBase-1 (74LS83).
  12. Connect Pin-19 (Output) of ICBase-1 (74LS83) to Output-9.
  13. Connect Output-8 to Pin-2 (Output) of ICBase-1 (74LS83).
  14. Connect Output-7 to Pin-6 (Output) of ICBase-1 (74LS83).
  15. Connect Output-6 to Pin-13 (Output) of ICBase-1 (74LS83).
  16. Connect Pin-17 (Input) of ICBase-1 (74LS83) to Manual clock Port.