New Circuit

Ajeesh
Ajeesh
Created on Nov 8, 2025 0 0 2
New Circuit
100%

Integrated Circuits Used

Procedure

  1. Add IC 74LS08 into ICBase-2 (74LS08).
  2. Connect Pin-7 (Ground) of ICBase-2 (74LS08) to GND Port.
  3. Connect Pin-20 (VCC) of ICBase-2 (74LS08) to VCC Port.
  4. Connect Pin-19 (Input) of ICBase-2 (74LS08) to Input-0.
  5. Connect Pin-18 (Input) of ICBase-2 (74LS08) to Input-1.
  6. Add IC 74LS04 into ICBase-1 (74LS04).
  7. Connect Pin-19 (Input) of ICBase-1 (74LS04) to Pin-17 (Output) of ICBase-2 (74LS08).