New Circuit

Yash Gosavi
Yash Gosavi
Created on Nov 9, 2025 0 0 1
New Circuit
100%

Integrated Circuits Used

Procedure

  1. Add IC 74LS194 into ICBase-1 (74LS194).
  2. Connect Input-0 to Pin-1 (Input) of ICBase-1 (74LS194).
  3. Connect GND Port to Pin-7 (Input) of ICBase-1 (74LS194).
  4. Connect GND Port to Pin-6 (Input) of ICBase-1 (74LS194).
  5. Connect VCC Port to Pin-18 (Output) of ICBase-1 (74LS194).
  6. Connect Clock port of 5Hz frequency to Pin-13 (Input) of ICBase-1 (74LS194).